There are thousands of possible combinations for decarbonising heat demand. At Solatom we calculate the cost of the optimal design for each level of decarbonisation. To do this we built our own tool, the CCD (Decarbonisation Cost Curve).
To find the optimal design we need to understand how your factory works: what it demands, what space and electrical capacity you have available, and whether there is waste heat that could be recovered.
We organise the input data into six groups. From those six groups we build a digital model of your factory, which then feeds the CCD.

We combine 11 technologies in 31 different hydraulic schemes. Each combination produces a family of designs by varying the equipment suppliers, their sizes, power ratings and operating strategies.
The equipment for each technology is real commercial equipment, with its own performance and prices.
We simulate every design hour by hour over a full year, to follow your factory’s demand, changing electricity prices and the intermittency of renewables. For each hour, the thermodynamic engine calculates how much heat each unit produces, how much is stored and how much is still needed.
Each unit is modelled individually, with its hydraulic and electrical side. The plant works in parallel with the conventional boiler. We simulate the renewable energy the plant generates every hour; when it is not enough to meet demand, the conventional boiler is used.
That is why the price we give you is far more accurate: it is not the price of the energy the plant produces, but of the energy your factory actually uses.
The economic engine builds each design's bill of materials: components come from its hydraulic (P&ID) and electrical (single-line) diagrams, and each has its own cost. On top of that it adds operation, maintenance and the energy the plant consumes over its service life.
From all this we obtain the energy sale cost: the price in €/MWh at which the plant delivers heat over the energy sale contract. Costs are updated with real quotes from Solatom projects, and uncertainty is bounded following the AACE methodology*.
That is why the price is so tight: the simulation already includes a budget for every component. In a conventional project, that level of detail only exists after basic engineering or FEED (Front-End Engineering Design). We have it from the very first calculation.
* AACE International is the leading cost-engineering association. It classifies estimate accuracy from Class 5 (preliminary estimate) to Class 1 (definitive budget). CCD costs combine Class 2 to 4 quotations, and the uncertainty band on the curve reflects that mix.
For each percentage of decarbonisation at your factory, we give you the most competitive renewable energy price.
Each viable design is described by two numbers: its decarbonisation level (the share of your heat demand covered by renewables over the year) and its heat cost in €/MWh. Each design is a point.
Placing the 310,000 designs produces a cloud of points. For each decarbonisation level we keep the design with the cheapest heat. Joined together, those designs form the envelope: your decarbonisation cost curve (CCD). We give you the CCD free of charge.
* Accuracy band based on the AACE International classification (see step 04).
With the CCD you can see whether any decarbonisation level is attractive for your factory. If it is, pick that point and we study it in detail: we deliver the technology solution, a price review and its engineering.
The curve is free; the detailed study is not. But we are so confident in our calculations that, if the detailed study does not match the values on the curve, it costs you nothing.

Tell us about your case and we will send you your curve, free and with no commitment.
We don't track you here: no analytics, no advertising. We only remember your language, theme and this choice. If you want to watch our videos without leaving the site, YouTube needs its own cookies. Your call. Cookie policy