Cost calculation · The CCD

What will decarbonising cost me?

There are thousands of possible combinations for decarbonising heat demand. At Solatom we calculate the cost of the optimal design for each level of decarbonisation. To do this we built our own tool, the CCD (Decarbonisation Cost Curve).

The CCD in six steps
Your CCD in under 24 hours.That speed rests on hundreds of hours of engineering and years of experience on real projects. This is how we make it possible, in six steps:
01Your site data02The design space03The hourly simulation04The cost of each design05The curve06From the curve to the project
01 · YOUR SITE DATA

Tailored to your factory

To find the optimal design we need to understand how your factory works: what it demands, what space and electrical capacity you have available, and whether there is waste heat that could be recovered.

We organise the input data into six groups. From those six groups we build a digital model of your factory, which then feeds the CCD.

Gas-fired steam boiler in a factory boiler room
Heat demandMWh/year · Hourly profile
ProcessFluid, temperatures and pressure
SiteLocation · Available areas
ElectricityAvailable capacity · Consumption profile · Self-generation
Waste heatFluid, temperature and flow · Hourly profile
PricesGas, electricity
02 · THE DESIGN SPACE

We evaluate every possible design

We combine 11 technologies in 31 different hydraulic schemes. Each combination produces a family of designs by varying the equipment suppliers, their sizes, power ratings and operating strategies.

The equipment for each technology is real commercial equipment, with its own performance and prices.

  • 11 generation, conversion and storage technologies
  • 31 hydraulic integration schemes
  • More than 40 commercial units in the catalogue
1Available technologies
CSTFPCETCPVPVTHPEBDTTLHSEHSBAT
2We combine them
CST + DTT
CCD integration scheme· Desliza para verlo entero →
3We try different equipment and sizes
Each design is tested with different real commercial equipment, with its own performance and cost.
4We build the set of possible designs
0different viable designs
03 · THE HOURLY SIMULATION

We simulate each design over a year, hour by hour

We simulate every design hour by hour over a full year, to follow your factory’s demand, changing electricity prices and the intermittency of renewables. For each hour, the thermodynamic engine calculates how much heat each unit produces, how much is stored and how much is still needed.

Each unit is modelled individually, with its hydraulic and electrical side. The plant works in parallel with the conventional boiler. We simulate the renewable energy the plant generates every hour; when it is not enough to meet demand, the conventional boiler is used.

That is why the price we give you is far more accurate: it is not the price of the energy the plant produces, but of the energy your factory actually uses.

  • Hour-by-hour energy flows over 8,760 hours
  • Hybrid operation with your gas boiler, hour by hour
  • Hydraulic and electrical modelling of each component
  • Detailed field design for solar solutions
  • 310,000 designs × 8,760 h ≈ 2,715 million simulations
Design #1,356CST + DTTCSTUnit B · 2,500 m² · DTTUnit A · 150 m³
Hourly PFD21 jun · 00:00
00 h06 h12 h18 h24 h
Hourly energy balance
Full year · each pixel is an hour
JanAprJulOctDec
0 %annual decarbonisation
Solar thermalStorage (tank)Gas boiler
Illustrative values.
04 · THE COST OF EACH DESIGN

We cost every design, component by component

The economic engine builds each design's bill of materials: components come from its hydraulic (P&ID) and electrical (single-line) diagrams, and each has its own cost. On top of that it adds operation, maintenance and the energy the plant consumes over its service life.

From all this we obtain the energy sale cost: the price in €/MWh at which the plant delivers heat over the energy sale contract. Costs are updated with real quotes from Solatom projects, and uncertainty is bounded following the AACE methodology*.

That is why the price is so tight: the simulation already includes a budget for every component. In a conventional project, that level of detail only exists after basic engineering or FEED (Front-End Engineering Design). We have it from the very first calculation.

  • 206 individually costed components
  • 4 financial models, including Heat Purchase Agreements
  • 3 subsidy models

* AACE International is the leading cost-engineering association. It classifies estimate accuracy from Class 5 (preliminary estimate) to Class 1 (definitive budget). CCD costs combine Class 2 to 4 quotations, and the uncertainty band on the curve reflects that mix.

Design #1,356CST + DTTCSTUnit B · 2,500 m² · DTTUnit A · 150 m³
From the PFD to the bill of materialsPFD
P&IDLine “CST loop cold” · DN150 · 62 m
BOM detailQty€
Line total0 €
Whole plant · 206 components + civil works and engineering0 M€CAPEX
+ O&M + energy used, spread over 25 years of useful heat0 €/MWhLCOH
Illustrative values.
05 · THE CURVE

We keep the best design at each level

For each percentage of decarbonisation at your factory, we give you the most competitive renewable energy price.

Each viable design is described by two numbers: its decarbonisation level (the share of your heat demand covered by renewables over the year) and its heat cost in €/MWh. Each design is a point.

Placing the 310,000 designs produces a cloud of points. For each decarbonisation level we keep the design with the cheapest heat. Joined together, those designs form the envelope: your decarbonisation cost curve (CCD). We give you the CCD free of charge.

  • Each point on the curve carries its technologies, suppliers and sizes
  • Energy (MWh), % decarbonisation and €/MWh for each option
Each design, one point · illustrative
Viable designsBest design per levelAACE uncertainty*Gas boiler

* Accuracy band based on the AACE International classification (see step 04).

06 · FROM THE CURVE TO THE PROJECT

You pick the point. We build the project.

With the CCD you can see whether any decarbonisation level is attractive for your factory. If it is, pick that point and we study it in detail: we deliver the technology solution, a price review and its engineering.

The curve is free; the detailed study is not. But we are so confident in our calculations that, if the detailed study does not match the values on the curve, it costs you nothing.

Solatom team commissioning a hydraulic unit on site
On-site commissioning
From data to projectYour factory dataDemandProcessSiteElectricityWaste heatPricesWe calculate your CCD310,000+ designs evaluatedWe send you your CCDFreeIs there anattractive point?NoThe CCD isyours, nostrings attachedYesDetailed studyFree if it missesTechnology solution · Price review · EngineeringEnergy saleYou buy the heatTurnkeyThe plant is yours

How much do you want to decarbonise?

Tell us about your case and we will send you your curve, free and with no commitment.

Get your curve