SISolar Impulse Pioneer 2025 · FinalistSolar Impulse Foundation
DLSustainability Award 2025 · WinnerDiario Levante
The plant, layer by layer · schematic model
The plot at the start of the worksThe plot, levelled and compactedConcrete supports, flush with the groundUnloading a pre-assembled moduleSteam generator, insulatedThe finished solar field
Loading the 3D model…Drag to rotate
The challenge
Decarbonise the factory’s 6.5 bar steam demand with no investment. The available land was limited, irregular in shape and sloping, and the boiler room is 350 m away.
The solution
An FLT20 field with 6,000 m² of mirrors on two terraces with different orientations. The solar field heats a pressurised-water circuit that feeds the steam generator. There, saturated steam is produced at operating pressure and carried to the factory header, 350 m away. A small 30 m³ store buffers passing clouds. The plant runs fully automatically.
Business model
Heineken pays only for the steam it receives from the plant: the project is a 15-year HPA (Heat Purchase Agreement). Solatom handles operation and maintenance for the whole contract.
Solar field and steam generation unit, next to the factory.
How the plant worksSix operating modes, from start-up to night. Tap to see the animation.
Would you like to see the plant in operation?
We organise visits to the Heineken plant in Valencia. Write to us and we will find a date.
We don't track you here: no analytics, no advertising. We only remember your language, theme and this choice. If you want to watch our videos without leaving the site, YouTube needs its own cookies. Your call. Cookie policy